22.07.2011

Grand opening ceremony of new office building

On 22nd July 2011 APROVIS Energy Systems GmbH held the grand opening ceremony for its new, state-of-the-art office building. About 250 people, employees and their families and special guests from the region, attended the event. Member of German parliament Josef Göppel and the mayor of Weidenbach Gerhard Siegler were among the guest speakers. The 1700 sqm state-of-the-art office building is another milestone in the history of APROVIS Energy Systems GmbH. From the beginning there was a special focus on the office equipment and the energy efficiency of the building. The highlights of the utilities the building is equipped with are a natural gas CHP for baseload, a natural gas condensing boiler for peaking, a chiller for air conditioning during summer times and ventilation with heat recovery. This is a strong commitment to APROVIS Energy systems GmbH`s mission “Energy efficiency is our incentive. With our daily work we contribute to a better world.”

The new building is the working place of 70 employees at present. These people work in the fields of project planning / sales, design, electrical engineering, order management and service to provide customized solutions and finally contribute to further growth of APROVIS Energy Systems GmbH.




Latest News

20Marzo2012

Industries improve their...

The shown steam generator unit is installed at a waste food treatment plant in the UK....

Più avanti

13Marzo2012

On top of Madrid



Capacity: 540kWth

The exhaust gas heat exchanger recovers the heat of a...

Più avanti

25Gennaio2012

BioGas World 2012


...

Più avanti

16Dicembre2011

biogas fair


...

Più avanti

28Ottobre2011

AGRITECHNICA 2011


...

Più avanti

22Luglio2011

Grand opening ceremony of new...

On 22nd July 2011 APROVIS Energy Systems GmbH held the grand opening ceremony for its new...

Più avanti

11Gennaio2011

20. BIOGAS - Annual Conference and...

We participate in Nuremberg

Più avanti

11Gennaio2011

20. BIOGAS - Annual Conference and...

We participate in Nuremberg

Più avanti

22Giugno2009

Exhaust Gas Heat Recovery Units...

A project in Russia involved the use of exhaust gas heat recovery units with integrated...

Più avanti

22Giugno2009

Unità per lo sfruttamento termico...

Nel caso di un progetto in Russia, sono state installate unità per lo sfruttamento...

Più avanti

09Giugno2009

Generatore di vapore in Austria

Questo generatore di vapore viene utilizzato in un impianto di depurazione in Austria. Il...

Più avanti

09Giugno2009

Steam Generator in Austria

This steam generator is operated at a waste water treatment plant in Austria. The exhaust...

Più avanti

05Aprile2009

Exhaust Gas-Heated Steam...

The installation of exhaust gas-heated steam generators in cogeneration plants helps to...

Più avanti

05Aprile2009

Impianto di generazione del vapore...

L'installazione di impianti di generazione del vapore a gas di combustione in impianti di...

Più avanti

11Febbraio2009

Deumidificazione del gas con...

Dati tecnici:
Flusso del volume di gas: 700 Nm³.
Temperatura di ingresso del gas...

Più avanti

11Febbraio2009

Gas Dehumidification incl....

Technical data:
Gas volume flow: 700 Nm³/h
Gas inlet temperature: 35°C...

Più avanti