22.07.2011

Grand opening ceremony of new office building

On 22nd July 2011 APROVIS Energy Systems GmbH held the grand opening ceremony for its new, state-of-the-art office building. About 250 people, employees and their families and special guests from the region, attended the event. Member of German parliament Josef Göppel and the mayor of Weidenbach Gerhard Siegler were among the guest speakers. The 1700 sqm state-of-the-art office building is another milestone in the history of APROVIS Energy Systems GmbH. From the beginning there was a special focus on the office equipment and the energy efficiency of the building. The highlights of the utilities the building is equipped with are a natural gas CHP for baseload, a natural gas condensing boiler for peaking, a chiller for air conditioning during summer times and ventilation with heat recovery. This is a strong commitment to APROVIS Energy systems GmbH`s mission “Energy efficiency is our incentive. With our daily work we contribute to a better world.”

The new building is the working place of 70 employees at present. These people work in the fields of project planning / sales, design, electrical engineering, order management and service to provide customized solutions and finally contribute to further growth of APROVIS Energy Systems GmbH.




Latest News

20Março2012

Industries improve their...

The shown steam generator unit is installed at a waste food treatment plant in the UK....

Adicional

13Março2012

On top of Madrid



Capacity: 540kWth

The exhaust gas heat exchanger recovers the heat of a...

Adicional

25Janeiro2012

BioGas World 2012


...

Adicional

16Dezembro2011

biogas fair


...

Adicional

28Outubro2011

AGRITECHNICA 2011


...

Adicional

22Julho2011

Grand opening ceremony of new...

On 22nd July 2011 APROVIS Energy Systems GmbH held the grand opening ceremony for its new...

Adicional

11Janeiro2011

20. BIOGAS - Annual Conference and...

We participate in Nuremberg

Adicional

11Janeiro2011

20. BIOGAS - Annual Conference and...

We participate in Nuremberg

Adicional

22Junho2009

Exhaust Gas Heat Recovery Units...

A project in Russia involved the use of exhaust gas heat recovery units with integrated...

Adicional

22Junho2009

Unidades de recuperação de calor...

Em um projeto na Rússia, foram instaladas unidades de recuperação de calor proveniente...

Adicional

09Junho2009

Geradores de vapor na Áustria

Este gerador de vapor está funcionando em uma estação de tratamento de águas...

Adicional

09Junho2009

Steam Generator in Austria

This steam generator is operated at a waste water treatment plant in Austria. The exhaust...

Adicional

05Abril2009

Exhaust Gas-Heated Steam...

The installation of exhaust gas-heated steam generators in cogeneration plants helps to...

Adicional

05Abril2009

Instalação geradora de vapor...

A instalação de geradores de vapor aquecidos por gases de escape em sistemas de...

Adicional

11Fevereiro2009

Sistema de desumidificação com...

Dados técnicos:
Débito volumétrico de gás: 700 Nm³.
Temperatura de entrada do...

Adicional

11Fevereiro2009

Gas Dehumidification incl....

Technical data:
Gas volume flow: 700 Nm³/h
Gas inlet temperature: 35°C...

Adicional